Production mold making

Production molds.
Built around your part.

Start with the part geometry, resin and production expectations. Define a mold-making project with clear trial and acceptance requirements.

AI-generated illustration of a CNC spindle and clamped mold insert
CNC mold machiningAI-generated equipment illustration.
Since 2004Manufacturing experience
Build to printYour drawing is the starting point
ISO 9001:2015Quality management
Prototype → productionA route matched to your project

Define the tooling project

Consider the part and the production plan together.

Tooling decisions affect the finished component, maintenance and future production.

RequirementWhat to specifyWhy it matters
Part & resinApproved PDF drawing and STEP model of the same revision; intended resin grade and any permitted substitutes.Shrinkage, flow and part requirements influence tooling decisions.
Production demandExpected quantities, quantity tiers and units, batch size, repeat demand, project lifecycle and target date.These help frame cavity layout and tooling requirements.
AppearanceTexture, cosmetic faces and allowable parting or gate marks.Visible surfaces need clear acceptance references.
Trial requirementsSample quantity, critical dimensions, measurement method, sampling, report format, any certificate of conformance (CoC) and the approval process.A tooling trial needs a defined path to acceptance.
Tooling handoverOwnership, location of molding, maintenance and documentation.Agree on responsibilities before the project starts.
Commercial & DFMTarget price range, trade and payment terms, and whether DFM feedback may propose tolerance or design changes.Sets the commercial basis and how far the part design can change.

On small screens, swipe the table horizontally to see every column. Final requirements are confirmed during engineering review.

Design for manufacture

Resolve questions before cutting the tool.

Review draft, wall transitions, ribs, undercuts and the proposed parting line. Discuss gating and ejection around functional and cosmetic requirements.

Connect tooling with injection molding →

Make sample approval specific.

  • Drawing revision and resin specification
  • Critical dimensions and visual standards
  • Trial samples and inspection records
  • Any agreed changes before production release

Four decisions before tool manufacture.

  • Freeze the part revision: record the geometry, resin grade and assembly features that the tool must produce. Keep later design changes separate from corrections needed to meet the agreed design.
  • Approve the tool concept: review parting lines, gates, ejection, cavity layout and any moving features together with visible surfaces.
  • Define the trial: specify the trial material, samples and dimensional, assembly and appearance checks that will be used for acceptance.
  • Define the destination: confirm where the tool will run and which machine interfaces, documents and handover items need to be included.

Project questions

Before you request a quote.

A few details help us give you a more useful response.

What information is needed for a mold-making quote?

Share the part model, drawing, resin grade, target quantities and any cosmetic or inspection requirements. Include the intended molding location and tooling handover expectations.

Should I choose rapid tooling or a production mold?

The choice depends on your validation stage, material, part design and production demand. Share those requirements so the tooling route can be reviewed before making a decision.

How are tooling trials approved?

Agree on sample requirements, dimensions and visual criteria before the trial. Review the results against the approved drawing and document any changes before production release.

What a mold trial and handover should cover.

Trial samples and findings

Identify the tool and part revision, trial resin and sample set. Record fit, dimensions and visual observations against agreed criteria so a correction can be distinguished from a new design request.

Corrections and approval

Keep an action list for tool adjustments, part-design decisions and any retrial. Tool acceptance and production-part approval are separate decisions; agree the evidence required for each.

Tool delivery

Confirm ownership, transport protection, available drawings, maintenance responsibilities and any agreed spare components. For a transfer, review the receiving molding setup before shipment.

Tool life, cycle time, cavity count and delivery dates are project-specific quotation items. A design discussion does not establish a guaranteed production output.

Compare pilot tooling with production tooling →

Technical guides

Related reading

All injection molding and mold making guides →

Have a drawing ready?

Send your design, material and target quantity. We’ll review the requirements and the right manufacturing route.

Discuss your project →